RESERVOIR INFLOW COMPUTATIONS (1) ROANOKE RIVER BASIN, VA.-N.C. ISLAND CREEK SUBIMPOUNDMENT Feb 01 ELEVATION,FT,MSL TOTAL CHANGE IN CONTENTS FLOW, CFS (2) GUIDE RESERVOIR CONTENTS ACRE- DAY-SEC-FEET (3) DATE HOUR CURVE LEVEL AF FEET STORED DRAWDOWN OUTFLOW INFLOW 258.00 258.20 1572 1 258.00 258.40 1624 52 26 26 2 258.00 258.50 1650 26 13 13 26 3 258.00 258.10 1546 -104 -52 66 14 4 258.00 258.30 1598 52 26 26 5 258.00 258.50 1650 52 26 26 6 258.00 258.10 1546 -104 -52 68 16 7 258.00 258.30 1598 52 26 26 8 258.00 258.50 1650 52 26 26 9 258.00 258.10 1546 -104 -52 68 16 10 258.00 258.30 1598 52 26 26 11 258.00 258.50 1650 52 26 26 12 258.00 258.10 1546 -104 -52 65 13 13 258.00 258.40 1624 78 39 39 14 258.00 258.50 1650 26 13 17 30 15 258.00 258.20 1572 -78 -39 68 29 16 258.00 258.30 1598 26 13 40 53 17 258.00 260.60 2240 642 324 4 328 18 258.00 260.70 2270 30 15 139 154 19 258.00 260.20 2120 -150 -76 138 62 20 258.00 259.60 1948 -172 -87 135 48 21 258.00 258.90 1754 -194 -98 131 33 22 258.00 258.20 1572 -182 -92 119 27 23 258.00 258.50 1650 78 39 39 24 258.00 258.30 1598 -52 -26 67 41 25 258.00 258.30 1598 0 54 54 26 258.00 258.60 1676 78 39 39 27 258.00 258.30 1598 -78 -39 67 28 28 258.00 258.20 1572 -26 -13 52 39 TOTAL FOR MONTH............. 0 677 -678 1311.291 1310 NET CHANGE IN DAY-SEC-FEET.. 0 -1 1 AVERAGE FLOW IN C.F.S....... 0 0 47 47 CHANGE IN CONTENTS FOR MO.(4) 0 (1) COMPUTATIONS BASED ON THE OCTOBER 1953 CAPACITY TABLE. (2) BY 24-HOUR CLOCK, TIME IS 2400(MIDN.) OF DAY INDICATED UNLESS OTHERWISE NOTED. AVERAGE FLOW OR CHANGE IN RESERVOIR CONTENTS ARE FOR PERIOD ENDING AT THE TIME INDICATED. (3) BASED ON PROJECT RECORDS. DOES NOT INCLUDE EVAPORATION LOSSES. (4) BASED ON TOTAL CONTENTS AT BEGINNING AND END OF MONTH.